March 2024 Goals
March 2024 goals and daily notebook entries.
Goals
Writing and manuscripts
- Submit molecular underpinnings (Ch.1)
- A.pul gametogenesis final figures, results sections for histology analysis
- Marine heatwaves manuscript figures
- POC species identification E5
Sample processing
- Histological image analysis (abundance and size)
- Library prep for heatwave WGBS samples (12)
Data analysis
- BS-SNPer, filter SNPs from WGBS data
- Work on DEG analysis for heatwave after mapping sequences to de novo transcriptome
- Histological image/gonad analyses
Daily log
March 1
- Traveling
March 4
- Traveling
March 5
- Traveling
March 6
- TA 11-11:50am
- UC Merced interview
- +5 TA statistics work
- CBLS GitHub fixing issue
- Lab meeting
- Reworked SMART goals
- Wrote student statement for summer stipend support
March 7
- Molec underpinnings introduction edits
- Interview prep
- POC files upload to Unity
- BS-SNPer 10x file download
- Histology image analysis
March 8
- Austin +5 TA meeting
- TA 11-11:50
- E5 molecular meeting
- Serenas defense
- UNCW interview
- Molec underpinnings introduction edits
- Histology image analysis
March 11
- Finished molec underpinnings introduction edits, sent to Hollie
- Applied for Summer Stipend Support through graduate school
- Histology image analysis
- Aquarium daily tasks, calibrated orion sal probe, uploaded measurements, added TA data to CBLS wetlab
- BS-SNPer meeting with Kevin and Emma, made GFF motif with CG sites
March 12
- Vis-a-thon planning meeting
- Writing/ journal club meeting
- Feedback and edits on Ch.2 manuscript introduction
- Sent Moorea package with supplies to Jordan in California
- TA grading
- Histology image analysis
March 13
- Histology image analysis
- Lab meeting 12-1:30pm
- A.pul gametogenesis introduction edits
- Knauss notification as RI finalist!
March 14
- Writing retreat!
- Wrote and edited three into paragraphs for A.pul gametogenesis manuscript
- Made manuscript draft for SeaLifeBase citation analysis for +5 TA
March 15
- +5 TA meeting
- Citation analysis work
- Histological image analysis
- Edits to C. virginica Methylation and Gene Expression manuscript
March 16
- Manuscript edits for Kevins perspective piece
March 17
- Manuscript edits for Kevins perspective piece
March 18
- Histological image analysis
- TA 11-11:50, led a lecture class myself!
- TA grading
March 19
- Histological image analysis
- Putnam writing meeting 11-12:30
- SNP-WGBS meeting 3:30-4:30pm
- Filtered SNPs from data, re-analyzed WGBS data
- UC Merced second interview
March 20
- Histological image analysis
- TA 11-11:50
- Putnam lab meeting 12-1:30pm
- Aquarium duties and titrations
- Vis-a-thon planning 4:30-5:30
- Added summary for individual meetings with Hollie
March 21
- TA office hours 9-12pm
- +5 sealifebase manuuscript and kelp timeseries data analysis
- RISD for vis-a-thon planning and making installation
March 22
- +5 TA meeting 9:30-10:30
- +5 sealifebase mauuscript and kelp timeseries data analysis
- TA 11-12pm
- Molecular mechanisms meeting 12-1pm
- Re-analyzed WGBS data from filtered SNPs, wrote methods section for molec manuscript for BS-SNPer
- POC histone and POR H2 prep, located samples, prepped protocol
March 23
- RISD Vis-a-thon prep all day
March 24
- RISD Vis-a-thon prep all day and showcase :)
March 25
- Prep for 15 POC samples, ran PCR
- Histology image analysis
- TA 11-12pm
- TA meeting 12-1pm
- Ran post-PCR gel for POC samples
- RFLP prep and completion for POC samples
March 26
- Prep for 15 POC samples, negative and positive controls ran PCR
- Histology image analysis
- Ran post-PCR gel for POC samples, positive control did not cut
- RFLP prep and completion for POC samples gel and QC round two
- TA test corrections 14:00-16:00
- POR H2 PCR and QC with negative and two positive controls round 1
- POR H2 PCR with dilutions and negative and two positive controls round 2
March 27
- BIO 101 TA 11-12
- Histological image analysis
- POR H2 PCR results, move forward with 837 and 439 samples
- Nanodrop POR samples
- Prepped POR samples for sequencing
- Edited markdown for protocols used
- BIO 101 test corrections 13:30-14:30
- Hollie meeting 14:30-16:00
- Post PCR RFLP
March 28
- Submitted POR samples for sequencing 10am
- POC PCR and RFLP round 3
March 29
- TA meeting 9:30-10:30am
- BIO 101 TA 11-12pm
- POC PCR, post-PCR, and RFLP round 4, new, originally needed primers
- Histology image analysis
- BIO 101 TA grading
- Cleaned plugs and crates for BT 3/4, other aquarium duties
- Asked Oliver and James to put in work order for wetlab lights
March 31
- TA methods and results sections for SeaLifeBase manuscript
- TA Kelp Monitoring database updates
- Hollie meeting prep, update dissertation benchmarks and timelines
- Ch1 results and discussion updates after BS-SNPer
- A.pul histology figure with data processed thus far
Written on March 1, 2024